Navigation

Related Articles

Filter by Category

Filter by Author

Back to Latest Articles
A Block Building Update

A Block Building Update


Jeremy Turner
Jeremy Turner
A Block Building Update

This week students were fascinated to watch a huge drilling machine drill holes into the ground to prepare for them to be filled with concrete and create the strong subframe for the new entrance way to A Block. Towering above the two storey building, it looked impressive against the clear blue skies earlier this week. Mr Campion – Site Manager across the Trust reports that good progress has been made so far with the major refurbishment project scheduled for the next few months.

Related Articles

House Food Bank collection
Food Preparation and Nutrition

House Food Bank collection

It is lovely to witness the growing crates of donations from students and staff towards the local Red Trust Food Bank. Each House has a crate in which to place their donations of...

Posted on by Sara Ash - Deputy Headteacher
Picnic and Outdoor Shelter
School Development

Picnic and Outdoor Shelter

We encourage our students to make the most of our extensive grounds and enjoy the fresh air at break and lunchtime. A lovely place to sit in is our new picnic area outside our...

Posted on by Jeremy Turner